Thermal and electrical energy, tonne by tonne.
Cement production combines a high-temperature kiln system, which accounts for most thermal energy demand, with grinding and material handling, which account for most electricity. Clinker output, raw meal chemistry, fuel mix and alternative fuel substitution all shape specific energy. A change in site consumption alone does not show which part of the process changed.
Where energy goes in cement, and where Arvane can help.
- Kilns & clinker
- Specific heat consumption against clinker output, kiln feed, burning zone conditions and kiln stability.
- Grinding & electricity
- Raw, coal and cement mill kWh per tonne against throughput, fineness and material properties.
- Alternative fuels
- Substitution rate, calorific value and moisture, and their effect on kiln stability and heat consumption.
- Production intensity
- Thermal energy, electrical energy and carbon per tonne of clinker and of cement.
- Track specific heat consumption and mill specific energy against comparable operating periods.
- Detect kiln and cooler operating conditions associated with higher fuel use.
- Separate fuel-mix, clinker and efficiency effects in carbon intensity.
- Compare heat recovery, fuel switching and mill upgrade scenarios on one baseline.
Where Arvane reads the process.
Amber instruments mark the signals Arvane relates for this process. Each site’s own instrumentation is mapped during scoping.
SCROLL TO VIEW THE FULL DRAWING →
- FI-103
- Kiln fuel / specific heat
- JI-201
- Cement mill kWh per tonne
- FI-105
- Alternative fuel rate
- WI-106
- Clinker output
The limits every recommendation respects.
Calcination emissions are a large share of cement CO₂ and depend on clinker chemistry, not energy efficiency. Arvane keeps energy-related and process emissions separate, so a fuel saving is never reported as a change in process emissions. Kiln stability and product quality constrain every recommendation.
Typical first scopes.
A first scope is one system or asset class with good data and a clear decision attached. These are common starting points; the right one depends on the site.
Kiln system
Specific heat consumption against clinker output, feed and burning-zone conditions.
Grinding circuits
Raw and cement mill kWh per tonne against throughput and fineness.
Compressed air and utilities
Base load and sequencing across plant utilities.
- Kiln and mill DCS data
- Production and quality records
- Fuel and alternative-fuel analysis
- Electrical sub-metering
- CMMS work orders
Tell us about your cement operation.
Describe the facility, the systems in place and the decision you need to make. We’ll review where Arvane can fit.