STEEL & METALS

Heat, melt and rolling, through the production sequence.

Electric arc furnaces, reheating furnaces and rolling mills have very different demand profiles. Grade, charge mix, hot charging, delays and the production sequence all influence energy per tonne of saleable product.

STEEL & METALSSCHEMATIC
PROCESS SIGNALENERGY DEMANDASSET CONDITIONARVANE / INDUSTRIAL SYSTEMSSCHEMATIC
Process and assetSignals Arvane relates

Where energy goes in steel & metals, and where Arvane can help.

OPERATING ENVIRONMENT
Furnaces & electric arc systems
Power-on time, kWh per tonne, charge mix and tap-to-tap performance.
Process heat & reheating
Furnace fuel against throughput, charge temperature and residence time.
Rolling
Mill motor loads against grade, reduction schedule and line utilization.
Production scheduling
Upstream and downstream dependencies, delays and hold times.
WHERE ARVANE CAN HELP
  • Establish energy baselines by route, grade and furnace.
  • Quantify the energy cost of delays, holds and cold charging.
  • Forecast electrical demand from the planned melt and rolling sequence.
  • Evaluate schedule options against tariff periods within metallurgical and delivery constraints.

Where Arvane reads the process.

Amber instruments mark the signals Arvane relates for this process. Each site’s own instrumentation is mapped during scoping.

Process flow schematic of an electric arc furnace melt shop and hot rolling line: transformer, arc furnace, ladle furnace, caster, reheat furnace and rolling stands.1122334455AABBGRID 33 kVT-101FURNACE TRANSFORMERJI101SCRAP / DRIF-101ELECTRIC ARC FURNACELF-101LADLE FURNACECC-101CONTINUOUS CASTERKI105NATURAL GASFI102RF-101REHEAT FURNACETI103MMMRM-301ROLLING STANDSJI104DC-301COILERLEGENDPROCESSUTILITYSIGNALINSTRUMENTSIGNAL ARVANE RELATESJ POWER · F FLOW · T TEMP · W WEIGHT · K TIME / COUNT · Q TOTALIZEDARVANE SYSTEMS / PROCESS FLOWEAF MELT SHOP AND HOT ROLLINGISSUED FOR INFORMATION · NOT TO SCALEDWGARV-PFD-201REVASHEET1 OF 1

SCROLL TO VIEW THE FULL DRAWING →

JI-101
Furnace kWh per tonne
FI-102
Reheat furnace fuel
JI-104
Mill motor load
KI-105
Delays and holds

The limits every recommendation respects.

CONSIDERATIONS

Comparisons across furnaces, routes or sites need consistent grade, quality and emissions boundaries. A furnace schedule cannot be optimized independently of the material flow and metallurgical requirements it serves.

Typical first scopes.

A first scope is one system or asset class with good data and a clear decision attached. These are common starting points; the right one depends on the site.

SCOPE 01

Melt shop

Furnace kWh per tonne by grade, charge mix and power-on time.

SCOPE 02

Reheat furnaces

Fuel per tonne against charge temperature, residence time and delays.

SCOPE 03

Load scheduling

Moving flexible melt or utility loads against tariff periods.

SYSTEMS USUALLY INVOLVED
  • Furnace and mill automation data
  • Production and grade records
  • Gas and electricity metering
  • Scheduling system data
  • Maintenance records
START WITH AN OPERATING PROBLEM

Tell us about your steel & metals operation.

Describe the facility, the systems in place and the decision you need to make. We’ll review where Arvane can fit.

ARVANE SYSTEMS

Explore Arvane

Request a Technical Briefing

The intelligence layer
for low-carbon industry.