Begin with a fixed-fee Assessment on your own data, run Arvane continuously at a site, or standardize across your portfolio. Every plan is scoped to the operation it serves.
01PLANS
PLAN 01
Assessment
Prove the value on one operating problem.
FOR
Teams that want evidence from their own plant data before a wider rollout.
SCOPE
One site, and one process, utility system or asset class.
INCLUDES
Connection to the data sources the problem needs
Baseline of normal performance under real operating conditions
Detection, forecasting or optimization around the defined problem
Findings reviewed with your engineering and operations teams
Written report with quantified opportunities and a recommended next scope
The same engineering standard applies whether the scope is one compressor house or a portfolio of plants.
01
Integration with existing systems
Read-first connections to your historians, meters and enterprise systems, through the routes your site approves.
02
Baseline and validation
Normal performance established from your own operating data, and findings reviewed with your engineers.
03
Human approval
Arvane recommends; your teams approve and execute every change through your own procedures.
03HOW PRICING IS SET
Priced by the operation in scope.
A quote reflects the sites, assets and systems Arvane connects to and models.
Access for the teams that use the results, from operations and energy to maintenance, engineering and sustainability, is set out in the same quote, so everyone works from the same data.
The equipment modelled and the systems connected at each site.
03Capabilities
Which platform capabilities each site uses.
04Deployment model
Arvane-managed cloud, private cloud, hybrid or customer-controlled.
05Integration effort
The work needed to reach your historians, meters and enterprise systems.
04QUESTIONS
Why are prices not listed?+
Price depends on the number of sites, the assets and data sources connected, and the deployment model. After a technical briefing we confirm the scope and provide a written quote.
Do we need to connect every system before starting?+
No. An Assessment connects only the systems one problem needs. Further sources are added as the scope grows.
Can an Assessment become a Site plan?+
Yes. The data connections, baseline and models built during the Assessment carry into the Site plan, so nothing is rebuilt.
What does implementation involve?+
Scoping, data access, a performance baseline and validation with your engineers, as described in the deployment approach.
START WITH AN OPERATING PROBLEM
Tell us the problem. We’ll propose the right plan.
Describe the facility, the systems in place and the decision you need to make. We’ll recommend a plan and confirm the scope in writing.