ARVANE SYSTEMSPLATFORMOPTIMIZATIONSHEET 02.5
OPTIMIZATION

Operating strategies that improve energy, cost and carbon without breaching plant limits.

Arvane evaluates sequencing, load allocation, set points and timing against defined objectives and hard constraints, and presents feasible candidates for engineering review.

CAPABILITY AT A GLANCESUMMARY
01
InputsAsset efficiency curves · Production requirements · Energy prices and tariffs
02
AnalysisDefine objectives → Set hard constraints → Search the feasible space → Present for review
03
SupportsWhich compressors should lead at this demand level?

Better operating points, inside the limits that matter.

THE PROBLEM
Equipment often runs on fixed sequences and set points chosen for reliability or convenience years ago. The lowest-energy alternative is only useful if production, safety and equipment limits still hold.
WHAT ARVANE ANALYZES
Asset efficiency curves, production requirements, energy prices and carbon factors, and the constraints set by process, safety, equipment and maintenance.
WHAT THE TEAM RECEIVES
Candidate operating strategies for sequencing, load allocation, set points and timing, each showing the objective it improves, the constraints it respects and any trade-off it introduces.
WHY IT MATTERS
Operating changes often cost little to implement. A well-evidenced candidate gives operations a specific change to review and test.

Four steps, each one open to review.

Every step records what it used and what it assumed, so an engineer can check the result rather than take it on trust.

  1. 01

    Define objectives

    Agree with the site which of energy, operating cost and carbon matter, and how they are weighted.

  2. 02

    Set hard constraints

    Record production requirements, safety limits, equipment envelopes, maintenance windows and availability.

  3. 03

    Search the feasible space

    Evaluate candidate strategies with asset efficiency models, and reject any that breach a constraint.

  4. 04

    Present for review

    Show each candidate with the objective it improves, the constraints it respects and its trade-offs.

Energy, cost and carbon can move in different directions. Moving a load can lower energy cost while raising carbon intensity. The operations team sets the priorities and approves the response.

CONSTRAINED DECISION MODEL
MINIMIZEEnergy + Operating cost + Carbon

Weights are agreed with the site. Objectives in different units are normalized before they are compared.

SUBJECT TOProduction requirementsSafety limitsEquipment constraintsMaintenance requirementsProcess limitsAvailability
Feasible candidate strategyEngineering review

TYPICAL INPUTS

  • Asset efficiency curves
  • Production requirements
  • Energy prices and tariffs
  • Emission factors
  • Process, safety and equipment limits
  • Maintenance windows

Which sources are connected is agreed for each site during scoping.

QUESTIONS IT ANSWERS

  1. Which compressors should lead at this demand level?
  2. Can the same output be delivered with less energy in the peak-tariff period?
  3. What does a lower-carbon schedule cost?
START WITH AN OPERATING PROBLEM

Discuss optimization for your operation.

Describe the facility, the systems in place and the decision you need to make. We’ll review where Arvane can fit.

ARVANE SYSTEMS

Explore Arvane

Request a Technical Briefing

The intelligence layer
for low-carbon industry.