ARVANE SYSTEMSAPPLICATIONSENERGY OPTIMIZATIONSHEET 03.1
ENERGY OPTIMIZATION

Find the energy that does not produce output.

Arvane separates the energy a process needs from the energy it uses while idle, starting, poorly sequenced or degraded, and shows where to act first.

APPLICATION AT A GLANCESUMMARY
01
ProblemBase load during idle periods, equipment left running between batches, poorly sequenced compressors and chillers, and peak demand that serves no production requirement.
02
DecisionWhich loads to switch off, re-sequence or reschedule, and which utility systems to investigate first.
03
ImpactLower energy cost per unit of output and lower peak demand charges, with no change to production.

The question is not where energy is consumed. It is whether the work being done justified it.

OPERATIONAL PROBLEM
Base load during idle periods, equipment left running between batches, poorly sequenced compressors and chillers, and peak demand that serves no production requirement.
RELEVANT DATA
Interval metering, equipment run status, production schedules and output, utility system data and the tariff structure.
ARVANE ANALYSIS
Splits consumption by operating period (producing, waiting, starting and stopping) and compares each with output and with equivalent historical periods.
DECISION SUPPORTED
Which loads to switch off, re-sequence or reschedule, and which utility systems to investigate first.
POTENTIAL BUSINESS IMPACT
Lower energy cost per unit of output and lower peak demand charges, with no change to production.

From a question to a verified change.

The work ends when the result has been checked against a baseline, not when a recommendation is made.

  1. 01

    Map consumption to operating periods

    Split each meter’s profile into producing, waiting, starting and stopping.

  2. 02

    Compare with output

    Express each period’s consumption against production and equivalent historical periods.

  3. 03

    Rank the opportunities

    Order loads by avoidable energy and cost, with the evidence for each.

  4. 04

    Act and verify

    Switch off, re-sequence or reschedule, then confirm the result against the baseline.

PRODUCING

Energy per unit of output

Compared across products, rates and process conditions.

WAITING

Demand while idle

Required utilities separated from avoidable running.

STARTING / STOPPING

Transient demand

Start sequences, warm-up and shutdown behaviour examined.

OUTPUTS

  • Base-load profile by area
  • Energy per unit by operating period
  • Ranked list of avoidable loads
  • Verification of the changes made
START WITH AN OPERATING PROBLEM

Start with the operating decision you need to improve.

Describe the facility, the systems in place and the decision you need to make. We’ll review where Arvane can fit.

ARVANE SYSTEMS

Explore Arvane

Request a Technical Briefing