SCENARIO PLANNING
Make alternatives comparable before committing capital.
Arvane models decarbonization options against the same measured baseline and shows how each holds up when tariffs, utilization and emission factors change.
APPLICATION AT A GLANCESUMMARY
01
ProblemHeat recovery, electrification, fuel switching and equipment upgrades are evaluated in separate studies with inconsistent baselines, which makes them hard to rank.
02
DecisionWhich interventions to fund, in what order, and which assumptions need confirming first.
03
ImpactCapital directed to the projects with the strongest energy, cost and carbon case under realistic assumptions.
01DECARBONIZATION SCENARIO PLANNING
Two projects that address the same emissions rarely carry the same cost, risk or production impact.
- OPERATIONAL PROBLEM
- Heat recovery, electrification, fuel switching and equipment upgrades are evaluated in separate studies with inconsistent baselines, which makes them hard to rank.
- RELEVANT DATA
- Measured energy and production baseline, equipment performance, capital and installation costs, tariffs and fuel prices, emission factors and downtime estimates.
- ARVANE ANALYSIS
- Models each intervention against the same baseline and tests its sensitivity to utilization, tariffs, grid intensity and implementation downtime.
- DECISION SUPPORTED
- Which interventions to fund, in what order, and which assumptions need confirming first.
- POTENTIAL BUSINESS IMPACT
- Capital directed to the projects with the strongest energy, cost and carbon case under realistic assumptions.
02HOW TEAMS USE IT
From a question to a verified change.
The work ends when the result has been checked against a baseline, not when a recommendation is made.
- 01
Measure the starting point
Build the baseline from operating data, not nameplate or design values.
- 02
Define the options
Specify each intervention’s scope, cost, downtime and expected effect.
- 03
Stress the assumptions
Vary tariffs, utilization, grid factor and fuel price to see which cases hold.
- 04
Sequence the investments
Order projects by return and dependency, including low-cost operating changes.
03IN DETAIL
| Criterion | Scenario AHeat recovery | Scenario BElectrification | Scenario COperating changes |
|---|---|---|---|
| Capital | Equipment, installation and tie-in | Electrical infrastructure and process conversion | Engineering time and instrumentation |
| Energy impact | Recovered heat at actual duty and availability | Electricity demand against fuel displaced | Consumption under revised settings |
| Carbon impact | Fuel emissions avoided | Depends on grid intensity and fuel replaced | Efficiency effect separated from output |
| Production impact | Shutdown for tie-in, then none | Heat quality and ramp rates to validate | Within existing process limits |
| Payback depends on | Utilization and fuel price | Tariffs, grid factor and infrastructure scope | Repeatability of the change |
04WHAT THE TEAM RECEIVES
OUTPUTS
- Side-by-side scenario comparison
- Sensitivity of each result
- Payback ranges
- Proposed sequencing for review
PLATFORM CAPABILITIES USED
OFTEN RELEVANT IN
START WITH AN OPERATING PROBLEM
Start with the operating decision you need to improve.
Describe the facility, the systems in place and the decision you need to make. We’ll review where Arvane can fit.
