ARVANE SYSTEMSINDUSTRIESMANUFACTURINGSHEET 04.5
MANUFACTURING

Energy per unit, including what runs between shifts.

Production lines share compressed air, HVAC, boilers, chillers and motor-driven systems. Consumption reflects product mix, cycle times, utilization and idle periods as much as equipment efficiency.

MANUFACTURINGSCHEMATIC
PROCESS SIGNALENERGY DEMANDASSET CONDITIONARVANE / INDUSTRIAL SYSTEMSSCHEMATIC
Process and assetSignals Arvane relates

Where energy goes in manufacturing, and where Arvane can help.

OPERATING ENVIRONMENT
Production lines
Energy per unit by product, line, shift and cycle time.
Motors & compressed air
Leakage, pressure settings, sequencing and idle running.
HVAC
Support load against occupancy, process heat gains and weather.
Boilers & utilities
Fuel against steam or hot-water demand and combustion efficiency.
WHERE ARVANE CAN HELP
  • Compare energy per unit across lines and sites on a consistent basis.
  • Quantify base load that persists outside productive hours.
  • Detect compressed air and utility losses.
  • Align production schedules with tariff periods and utility capacity.

Where Arvane reads the process.

Amber instruments mark the signals Arvane relates for this process. Each site’s own instrumentation is mapped during scoping.

Process flow schematic of plant utilities: air compressors, receiver, dryer and header feeding three production lines, electrical distribution and a steam boiler.1122334455AABBC-101 / 102 / 103AIR COMPRESSORSAIR INC-101C-102C-103TK-101RECEIVERD-101DRYERCOMPRESSED AIR HEADER · 7 BAR(G)FI104PI105L-1PRODUCTION LINEJQ201L-2PRODUCTION LINEJQ202L-3PRODUCTION LINEJQ203MAIN INCOMERLV DISTRIBUTIONJI200FUEL GASB-301STEAM BOILERFI301LEGENDPROCESSUTILITYSIGNALINSTRUMENTSIGNAL ARVANE RELATESJ POWER · F FLOW · T TEMP · W WEIGHT · K TIME / COUNT · Q TOTALIZEDARVANE SYSTEMS / PROCESS FLOWPLANT UTILITIES AND PRODUCTION LINESISSUED FOR INFORMATION · NOT TO SCALEDWGARV-PFD-501REVASHEET1 OF 1

SCROLL TO VIEW THE FULL DRAWING →

JQ-201
Line kWh per unit
JI-200
Idle base load
FI-104
Compressed air demand
FI-301
Boiler steam output

The limits every recommendation respects.

CONSIDERATIONS

Comparisons across sites must account for product mix, operating hours, climate and equipment configuration. A ranking that ignores those differences rewards the wrong behaviour.

Typical first scopes.

A first scope is one system or asset class with good data and a clear decision attached. These are common starting points; the right one depends on the site.

SCOPE 01

Compressed air

Leakage, pressure settings and compressor sequencing.

SCOPE 02

Line base load

Consumption that persists outside productive hours.

SCOPE 03

Energy per unit

Comparison across lines and sites on a consistent basis.

SYSTEMS USUALLY INVOLVED
  • Line and utility PLC data
  • MES production records
  • Sub-metering
  • Building management system
  • CMMS work orders
START WITH AN OPERATING PROBLEM

Tell us about your manufacturing operation.

Describe the facility, the systems in place and the decision you need to make. We’ll review where Arvane can fit.

ARVANE SYSTEMS

Explore Arvane

Request a Technical Briefing

The intelligence layer
for low-carbon industry.