PRODUCTION & ENERGY SCHEDULING
Decide when to produce, as well as how.
Where loads can move, Arvane evaluates candidate schedules against tariffs, peak demand and grid carbon intensity, inside delivery, ramping and staffing constraints.
APPLICATION AT A GLANCESUMMARY
01
ProblemProduction schedules are built around orders and capacity.
02
DecisionWhich batches, mills, furnaces or utility loads to move, and into which window.
03
ImpactLower energy cost and peak charges, and lower carbon intensity where grid intensity varies through the day.
01PRODUCTION & ENERGY SCHEDULING
Where a process has flexibility, timing is an energy decision.
- OPERATIONAL PROBLEM
- Production schedules are built around orders and capacity. Energy price, peak demand and grid carbon intensity are rarely part of the decision, even where loads could move.
- RELEVANT DATA
- Production plan and order constraints, equipment availability, storage and buffer capacity, tariff and price signals, grid carbon intensity and maintenance windows.
- ARVANE ANALYSIS
- Identifies flexible loads and evaluates candidate schedules against delivery commitments, ramp limits, minimum run times and staffing.
- DECISION SUPPORTED
- Which batches, mills, furnaces or utility loads to move, and into which window.
- POTENTIAL BUSINESS IMPACT
- Lower energy cost and peak charges, and lower carbon intensity where grid intensity varies through the day.
02HOW TEAMS USE IT
From a question to a verified change.
The work ends when the result has been checked against a baseline, not when a recommendation is made.
- 01
Identify flexible loads
Find the processes and utilities whose timing can change without affecting delivery.
- 02
Forecast the window
Forecast demand, price and grid intensity for the planning horizon.
- 03
Evaluate candidate schedules
Test alternatives against deadlines, ramping, minimum run times, storage and staffing.
- 04
Review and adopt
Planners review the cost and carbon difference of each schedule and choose.
03IN DETAIL
SCHEDULING WINDOWDEADLINES / CAPACITY / ENERGY
EARLY SHIFTMID SHIFTLATE SHIFT
Production deadline
Equipment available
Flexible process
Candidate window
04WHAT THE TEAM RECEIVES
OUTPUTS
- Inventory of flexible loads
- Candidate schedules with constraints shown
- Cost and carbon difference per schedule
- Forecast peak demand
START WITH AN OPERATING PROBLEM
Start with the operating decision you need to improve.
Describe the facility, the systems in place and the decision you need to make. We’ll review where Arvane can fit.