PERFORMANCE VERIFICATION
A project is complete. Did performance improve?
Arvane reports the change an intervention actually caused, net of output, product mix, weather and operating hours, with the uncertainty stated.
APPLICATION AT A GLANCESUMMARY
01
ProblemSavings are claimed from raw before-and-after comparisons, while output, product mix, weather and operating hours also changed.
02
DecisionWhether to replicate the project at other assets or sites, and which result to report.
03
ImpactDefensible savings figures, better replication decisions, and reported reductions with an engineering basis.
01PERFORMANCE VERIFICATION
Lower consumption after a project is not, on its own, evidence that the project worked.
- OPERATIONAL PROBLEM
- Savings are claimed from raw before-and-after comparisons, while output, product mix, weather and operating hours also changed.
- RELEVANT DATA
- Pre- and post-intervention consumption, production, product mix, ambient conditions, operating hours and the record of the intervention.
- ARVANE ANALYSIS
- Builds a baseline model from pre-intervention operation, applies it to post-intervention conditions and reports the difference with its uncertainty.
- DECISION SUPPORTED
- Whether to replicate the project at other assets or sites, and which result to report.
- POTENTIAL BUSINESS IMPACT
- Defensible savings figures, better replication decisions, and reported reductions with an engineering basis.
02HOW TEAMS USE IT
From a question to a verified change.
The work ends when the result has been checked against a baseline, not when a recommendation is made.
- 01
Agree the method first
Fix the baseline period, boundary and adjustment variables before the change is made.
- 02
Record the intervention
Log what changed, when, and on which assets.
- 03
Normalize and compare
Apply the baseline model to post-intervention conditions.
- 04
Report and decide
Publish the attributable change with its uncertainty, and decide whether to replicate.
03IN DETAIL
- 01Baseline
- 02Intervention
- 03Observed operation
- 04Normalized comparison
- 05Attributable change
04WHAT THE TEAM RECEIVES
OUTPUTS
- Normalized before-and-after comparison
- Attributable change with error bounds
- Documented exclusions and data gaps
- Evidence for replication decisions
PLATFORM CAPABILITIES USED
OFTEN RELEVANT IN
START WITH AN OPERATING PROBLEM
Start with the operating decision you need to improve.
Describe the facility, the systems in place and the decision you need to make. We’ll review where Arvane can fit.