What an intervention actually changed, separated from everything else that did.
Arvane builds a baseline model from pre-intervention operation and applies it to post-intervention conditions, so the effect of a project is reported net of changes in output, product mix and weather.
Establish what an intervention actually changed.
- THE PROBLEM
- After a project, consumption falls, but output, product mix, weather and operating hours have usually changed too. Without normalization, part of the reported saving is coincidence.
- WHAT ARVANE ANALYZES
- A pre-intervention baseline model, post-intervention operation, and the production, ambient and operating variables that affect consumption.
- WHAT THE TEAM RECEIVES
- A verification view separating the effect of the intervention from other changes, with the baseline, exclusions, data gaps and uncertainty documented.
- WHY IT MATTERS
- Verified results justify the next investment and give reported reductions an engineering basis.
Four steps, each one open to review.
Every step records what it used and what it assumed, so an engineer can check the result rather than take it on trust.
- 01
Fix the baseline period
Select representative pre-intervention operation and record any exclusions.
- 02
Model the drivers
Relate consumption to production, product mix, ambient conditions and operating hours.
- 03
Apply to the reporting period
Estimate what consumption would have been without the intervention.
- 04
Report with uncertainty
Publish the attributable change with its error bounds, data gaps and method.
Energy savings are kept distinct from changes in emission factors or reporting boundaries. A lower carbon figure caused by a cleaner grid is not credited to a project on the plant.
- 01Baseline
- 02Intervention
- 03Observed operation
- 04Normalized comparison
- 05Attributable change
TYPICAL INPUTS
- Pre- and post-intervention consumption
- Production and product mix
- Ambient conditions
- Operating hours
- Record of the intervention
Which sources are connected is agreed for each site during scoping.
QUESTIONS IT ANSWERS
- How much of the reduction did the project actually deliver?
- Is the result strong enough to replicate at other sites?
- Which figure belongs in the sustainability report?
Discuss verification for your operation.
Describe the facility, the systems in place and the decision you need to make. We’ll review where Arvane can fit.